
Drgem X Ray Service - Manual Install
Before installing any service manual or performing software restoration:
: Perform dark field (offset) and bright field (gain) calibrations inside the imaging software.
Switch on the generator. Verify that the control console boots up without displaying critical error codes. drgem x ray service manual install
Minimum clearance of 2.5 meters for ceiling-suspended 3D tube supports.
: Install a dedicated 3-phase, 380V/400V/480V line (or single-phase 220V for lower kW compact models). Before installing any service manual or performing software
Primary beam walls must have at least 35cm thick brick (or equivalent), while scatter walls require 23cm. Lead shielding (1.75mm) is necessary for doors and windows.
: Execute the manual seasoning procedure after long periods of inactivity or new installations. Follow this precise exposure matrix: Exposure Time Pause Interval 0.10 seconds 30 seconds 0.10 seconds 30 seconds 0.10 seconds 45 seconds 0.10 seconds 60 seconds Digital Detector Integration Minimum clearance of 2
: Bolt the manual or automatic collimator flange to the tube port face.
Verify that the electromagnetic locks engage and release smoothly when power is later applied. Wall Bucky Stand Installation
Keep relative humidity levels between 30% and 75% (non-condensing) to protect high-voltage components. 2. Electrical Power and Grounding Requirements